Pluto LNG (BGC Contracting)

Pluto LNG Project comprises of a new onshore LNG processing plant including a single LNG processing train, two LNG tanks with a combined capacity of 240,000m3, condensate tanks and an export jetty with a capacity of 4.3 million tonnes per year each. The project value was set at AU$15 billion, bringing together a joint venture between Woodside (90%) Tokyo Gas (5%) & Kansai Electric (5%).

Bosnafix was responsible for:

  • Installation of all reinforcement on two LNG full containment storage Prefabrication and installation of reinforcement wall mats.

  • Installation of buttress reinforcement.

  • Installation of all roof reinforcement and pedestals.

  • Total reinforcement tonnage 2500T.

  • Workforce of 2 Supervisors and 30 steel fixers. 


Project Dates: June 2008 - September 2009

Client: BGC Contracting / CBI

EPCM: Foster Wheeler Worley Parsons (FWW)

Owner: Woodside