Devil Creek Gas Project (John Holland)
The Devil Creek Development project was instigated to recover and process gas reserves from the Reindeer offshore gas field, located approximately 80 kilometres northwest from Dampier in Western Australia.
Devil Creek Gas plant comprises of an onshore gas plant and the onshore pipeline to the gas plant, in addition to the Non Process Infrastructure (NPI) required on the site. The two train gas plant was set to have a capacity to process 200 million cubic feet per day, a gas supply pipeline and a sales export pipeline. The project value was set to AU$9 billion, bringing together a joint venture between energy companies Santos (45%) and Apache Energy (55%).
Bosnafix was responsible for:
Installation of reinforcement for RC foundations associated with permanent process and non-process buildings.
Installation of reinforcement for train footings and pedestals.
Total reinforcement tonnage 800T.
Workforce of 1 Supervisor and 10 steel fixers.
Project Dates: September 2009 - April 2010
Client: John Holland
Owner: Apache Corporation